Michigan GPT

A pilot proposal that never names the machine

An AI pilot proposal for a Michigan plant can look finished and still leave out the machine, the shift, and the person who would use the tool.

A plant manager along I-94 can finish a vendor walk-through on a Thursday and have an AI pilot proposal in the inbox the following week. The cover spells the company name correctly. Someone on the visit noticed the racks in the lot and the labels on the totes. From the second page on, a reader still cannot tell which machine would be in the trial, which shift would run it, or which person would use the tool while a job is running.

Letterhead changes from firm to firm. The insides are shared, and they run about a dozen pages: an objective, a scope, a workplan, a timeline, a team page, and a page about value. Swap the footer for a stamping supplier downriver or a machine shop in West Michigan and the same sentences still fit the new plant.

A scope any plant could sign

A typical objective and success section reads like this. "The pilot will provide operators and maintenance personnel with timely guidance on selected production assets. Success will be measured by adoption, stakeholder feedback, and operational improvements identified during the engagement." Adoption, in that usage, means somebody used the tool. The sentences never say who, on which shift, or for which alarm. A reader can finish the page without learning the asset, the downtime code, or the defect a quality tech already writes on a ticket every week.

Scope lines add nouns and still postpone the choice: "selected critical assets," "priority use cases to be confirmed in discovery," and "stakeholders across operations, quality, and maintenance." A traveler written in that language would come back from the floor with pencil on it. Inside a proposal, the same lines pass as a finished section because the meeting is still in the conference room.

The workplan is the part that looks complete. There are workshops, a review of data the plant already stores, and a tool, called an assistant in one paragraph and a model in the next. After that comes a pilot of several weeks, training, a readout, and a suggestion to carry the approach to other assets. Eight to twelve weeks is the usual calendar. It still does not say which machine will be stopped so someone can see the alarms, or which die or fixture will be in it that week.

When the data section is more than a heading, it lists kinds of systems: ERP, CMMS, quality folders, sometimes a historian. It does not say whether the historian at this plant is a live connection to the control or a spreadsheet somebody saves on Fridays. A live connection can be read from the control. A Friday file has to be found, and by Monday morning it is already behind the machine. The proposal that names the category and skips the condition of the actual system learns the difference in the third week, after the calendar has already promised a working tool.

The team page lists an engagement lead and a person for the data on the vendor side. On the plant side it lists a project sponsor and "operational champions." The title does not say which shift the person works, or which machine sits idle while they are in a workshop. The page can name the person who leaves the machine and the person who covers it for that hour.

Purchasing turns to the value page, which talks about time lost to stops and hours spent hunting the last repair. The page does not start from this plant's morning report. Without the last full month of downtime codes on one named machine, a savings figure has no plant number to start from, so the dollars and the percentages stay off. Name the existing record the trial will use, and leave the arithmetic until that record is attached.

Buyers often ask for the vague version. Purchasing wants a price before legal will clear a walk-down of the line, and a vendor can only write what a tour and a public website will support. A general proposal is a fair answer to that request. The paid weeks, once the proposal is signed, go to finding the machine the scope skipped, under a title that says the pilot has already begun. A plant that wants help choosing a machine can buy that work as a workshop, on its own purchase order, and start the pilot after the name is known.

The names the crew already uses

The morning meeting already has a name for the equipment. Use that name, and put the CMMS tag beside it. A progressive press the crew calls the Minster may be P-07 in the CMMS, tagged that way when the database was built and never renamed after the nickname stuck. A gantry cell the crew calls cell 12 may sit under a longer asset number that nobody says out loud. If the proposal says only "selected press," or only the database tag, a search of the work orders will miss the name the writer left out. If the plant has not confirmed the pair, the scope should say the asset is still unnamed, so the first week is spent confirming it.

With the machine named, the open items are ordinary ones: which alarms that control throws, which of them are worth a call to the millwright, whether the last repairs live in closed work orders or in a notebook at the bench, and whether the setup sheet on the stand is the revision quality signed. The proposal can say those answers are not in hand yet. It should not spend the build weeks treating "selected production assets" as if a machine had been chosen.

A trial built around a Tuesday meeting with salaried staff will be judged later, when that room is empty. Second shift at a Tier Two supplier is often a thinner crew, with one supervisor covering more floor and a different person at the crib window than the one who was there at 9 a.m. If the tool is supposed to help someone decide whether to keep running or to call maintenance, that decision lands after the engineer from the demo is on the way home. The scope should name the shift that will run the trial, and whether anyone from that shift helped draft it. A closing meeting full of first-shift managers shows who attended. The scope still needs a line for whether the night crew opened the tool.

Name one user, plus a backup for the weeks that person is off. On the Minster, that may be the operator who clears the misfeed. On cell 12, it may be the quality tech who checks the bore after a tool change, or the millwright who gets the repeat call. The scope should say what that person does now during the minutes the tool is supposed to shorten. For a misfeed, the current sequence is often a walk to the bench book, a radio call to whoever had the die last, and a decision about rethreading the strip. A usable line says the tool will pull the last three closed work orders before that radio call, and that the rethread decision stays with the operator.

Training has to sit on that same person. A class at 10 a.m. in the conference room pulls someone from first shift and leaves second shift with a retelling from a supervisor who is not the user. Plants already arrange coverage for a class or a doctor's appointment. The proposal can name who stands at the machine while the user is in the room. If the trial is on second shift, hold the session at the start of that shift, or on overtime agreed before the first week. Otherwise the roster in the training plan and the people running the trial are two different lists.

A supervisor should be able to read the revised scope beside the machine. The crew's name for the press is on it, with the CMMS tag beside that name, and the shift that will run it for six weeks is on it too. The operator who agreed to use the tool is named, together with the supervisor who will notice if it sits unused. The comparison uses a record the plant already files, downtime codes or scrap tickets or setup hours, set beside the same record for the weeks before the trial. The morning meeting can write the machine, the shift, and the person on one page, send that page back with the proposal, and price the draft that returns.